EQUIPMENT FAMILY / PROJECT PLANNING

Drilling, piling & trenchless

Below ground takes more than a bucket.

Ground investigation, the required installation and the available working area shape the choice of specialist rig and supporting plant.

Explore equipment types ↓
Below ground takes more than a bucket.
Below ground takes more than a bucket. AI-generated editorial illustration for Excavators.tv; not a real project or specific machine model.

Rotary drilling & piling rigs

Foundation work starts with a specified foundation system and ground information. Clarify the proposed rig configuration, working platform, spoil handling and records required by the designer.

Piling hammers & vibratory equipment

Driving and extracting piles involve different equipment and site constraints from excavating soil. Ask how the specialist will address nearby structures, access and the required installation records.

Horizontal directional drilling

A trenchless installation still needs launch and receiving areas, utility information, fluid handling and a defined installed product. Include restoration and the management of drill cuttings in the scope.

Auger boring & pipe bursting

Different trenchless methods suit different installation or replacement briefs. Request a method-specific proposal explaining access pits, existing infrastructure and how completion will be verified.

Chain trenchers & rock trenchers

Continuous trenching equipment needs a clear route and material assessment. Compare the whole operation, including spoil removal, crossings, reinstatement and the equipment needed at interruptions.

Mixing, mud pumps & reclaimers

Fluid systems support specialist drilling rather than operating as an afterthought. Confirm who supplies, contains, processes and removes the fluids and cuttings.

Define the complete scope

Ask for the proposed machine configuration, delivery arrangements, supporting equipment, material handling and finished result in writing. Separate confirmed site information from assumptions, and agree how changed conditions will be documented and priced.

Questions before comparing proposals

  1. Which ground information supports the method?
  2. What temporary work areas are included?
  3. Which installation records will be handed over?

Use the contractor selection checklist →

Manufacturer background

Vermeer — directional drilling ↗

Reference for category background; no dealer relationship or particular model recommendation is implied.

Keep the machine working

Repair and maintenance questions · Parts and attachment compatibility · Buying used equipment