Locate before excavation
Contact the local utility-locate service and allow the required response time. Review marks with records, surface features and the owner. Use an approved exposure method in the tolerance zone.
Use a competent safety plan
A qualified person should assess conditions and select sloping, benching, shoring or shielding as local rules require. Keep spoil, materials and equipment back from the edge and provide safe access.
Control bedding and backfill
Use specified bedding, maintain line and grade, and place backfill in suitable lifts. Protect pipe or conduit from point loading and document crossings before covering.
Questions to ask
- What information or assumptions is this plan based on?
- Who is responsible for locates, permits, survey control and inspection?
- What site condition would stop or change the work?
- How are quantities, changes and disposal documented?
- What records remain when the work is complete?
Last reviewed: September 24, 2026. Educational information only.
